-
Notifications
You must be signed in to change notification settings - Fork 6.1k
Pull requests: pingcap/tidb
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
Backup: Modernize RunLoop architecture with unified BackupContext pattern
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
mydump: support Parquet LIST<FLOAT> as VectorFloat32
do-not-merge/needs-linked-issue
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#65487
opened Jan 8, 2026 by
joechenrh
Loading…
1 of 13 tasks
s3: increase retry attempts and max delay to compatible with SDK v1
approved
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65485
opened Jan 8, 2026 by
D3Hunter
Loading…
2 of 13 tasks
[WIP] bindinfo: avoid calling NormalizeStmtForBinding repeatedly
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65484
opened Jan 8, 2026 by
hawkingrei
Loading…
1 of 13 tasks
br: add keyspace-aware GC safepoint support for backup and restore
do-not-merge/needs-triage-completed
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#65483
opened Jan 8, 2026 by
RidRisR
Loading…
1 of 12 tasks
build(deps): bump github.com/golangci/golangci-lint/v2 from 2.4.0 to 2.8.0
dependencies
Pull requests that update a dependency file
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/release-note-label-needed
Indicates that a PR should not merge because it's missing one of the release note labels.
go
Pull requests that update Go code
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65480
opened Jan 8, 2026 by
dependabot
bot
Loading…
*: introduce external storage
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#65477
opened Jan 8, 2026 by
zeminzhou
Loading…
1 of 13 tasks
tests: support configurable temp directory for brietest via BRIETEST_TMPDIR (#65315)
cherry-pick-approved
Cherry pick PR approved by release team.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#65476
opened Jan 8, 2026 by
ti-chi-bot
Loading…
2 of 12 tasks
br: check duplicate database for pitr table filter
needs-cherry-pick-release-8.5
Should cherry pick this PR to release-8.5 branch.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65475
opened Jan 8, 2026 by
Leavrth
Loading…
2 of 13 tasks
action: support bazel crossbuild and upload the cache
approved
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
skip-issue-check
Indicates that a PR no need to check linked issue.
#65474
opened Jan 8, 2026 by
hawkingrei
Loading…
1 of 13 tasks
lightning: enhance import into backend for dm
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#65473
opened Jan 8, 2026 by
GMHDBJD
Loading…
1 of 13 tasks
store/copr: add defensive measures for bucket boundary bug (#65041)
do-not-merge/cherry-pick-not-approved
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
type/cherry-pick-for-release-nextgen-20251011
#65472
opened Jan 8, 2026 by
ti-chi-bot
Loading…
1 of 13 tasks
test: add test for pipelined DML on softdelete table | tikv=feature/active-active tidb-test=feature/active-active
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65470
opened Jan 8, 2026 by
tiancaiamao
Loading…
1 of 13 tasks
br: fix some bugs for pitr filter (#65394)
approved
cherry-pick-approved
Cherry pick PR approved by release team.
lgtm
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#65468
opened Jan 8, 2026 by
ti-chi-bot
Loading…
2 of 13 tasks
server: fix Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
kill query incorrectly killing idle connections
approved
lgtm
release-note
#65464
opened Jan 7, 2026 by
gengliqi
Loading…
1 of 13 tasks
[WIP] tests: add tiflash integration test
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65463
opened Jan 7, 2026 by
hawkingrei
Loading…
13 tasks
metrics: Add liveness check faults to grafana dashboard
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65460
opened Jan 7, 2026 by
MyonKeminta
Loading…
1 of 13 tasks
s3: add Content-MD5 header in S3Uploader for compatibility options
do-not-merge/needs-triage-completed
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#65457
opened Jan 7, 2026 by
GMHDBJD
Loading…
1 of 13 tasks
planner: outer join cannot be eliminated due to the impact of the expression index
do-not-merge/cherry-pick-not-approved
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65450
opened Jan 6, 2026 by
qw4990
Loading…
1 of 13 tasks
executor: optimize analyze column memory usage
component/statistics
do-not-merge/needs-triage-completed
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65446
opened Jan 6, 2026 by
guo-shaoge
Loading…
1 of 13 tasks
ddl: disallow creating temporary active-active or softdelete table
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65443
opened Jan 6, 2026 by
tiancaiamao
Loading…
1 of 13 tasks
fix: fix analyze with 1 buckets
component/statistics
contribution
This PR is from a community contributor.
do-not-merge/needs-triage-completed
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#65441
opened Jan 6, 2026 by
L-maple
Loading…
1 of 13 tasks
br: add credential not found error as non-retryable error
approved
lgtm
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65437
opened Jan 6, 2026 by
RidRisR
Loading…
2 of 13 tasks
executor: change Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
Grow parameter in Column.Reserve function
approved
lgtm
release-note-none
#65435
opened Jan 6, 2026 by
xzhangxian1008
Loading…
1 of 13 tasks
planner: derivePathStatsAndTryHeuristics can keep more MPP task (#65264)
do-not-merge/cherry-pick-not-approved
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
type/cherry-pick-for-release-8.1
This PR is cherry-picked to release-8.1 from a source PR.
#65433
opened Jan 6, 2026 by
ti-chi-bot
Loading…
1 of 13 tasks
Previous Next
ProTip!
Type g i on any issue or pull request to go back to the issue listing page.